Before You Book EICR Remedial Works: What C1, C2 and FI Codes Mean, What to Fix First and How to Avoid Open Compliance Issues
24/7
REACTIVE CALL-OUTS
100%
INCOMING CALLS ANSWERED
70+ YEARS
COMBINED TEAM EXPERIENCE
This article explains how to manage EICR remedial works following an unsatisfactory electrical inspection in commercial buildings across the Midlands and wider UK. It outlines what C1, C2, C3 and FI codes mean, which issues should be prioritised first, and what evidence is needed to show that remedial work has been completed. Whether you are a facilities manager, duty holder or commercial property manager, this guide provides clear insight into closing electrical compliance issues and the practical considerations surrounding urgency, access, costs, certification and audit-ready records.
EICR Remedial Works Following Unsatisfactory EICR
EICR Remedial Works Explained - From C1, C2 and FI Codes to Priorities, Cost Factors and Proof of Completion
You’ve opened the EICR report and it’s not the clean pass you were hoping for.
Instead, there are C1, C2 or FI codes listed, and now you need to work out what they mean for the building, your tenants, your team and your next inspection.
If you manage a commercial site, the questions are usually immediate:
“Is anything dangerous right now?”
“What needs fixing first?”
“Can we still show the building is being managed properly?”
“What paperwork do I need once the remedial work is done?”
The hard part is that EICR reports often explain the electrical issue, but not always the operational next step.
If the report came from fixed wire testing, you may know there is a problem, but still be unclear on how urgent it is, who needs to deal with it, or what counts as proof that it has been closed.
This guide gives you the key EICR codes explained in plain English, including C1, C2, C3 and FI.
It also explains how to prioritise
electrical remedial works after EICR, and how to avoid open issues, missing paperwork or last-minute questions before an audit, insurer review or tenant handover.


Commercial EICR Remedial Works Priority Process
Identify the Issue, Prioritise the Work and Leave With a Clear Record of What Has Been Fixed
| Current EICR Remedial Position | What This Looks Like in Practice | Main Risk If It Is Left Open | What Needs to Happen Next | Where JDP Helps |
|---|---|---|---|---|
| C1 immediate danger identified | The EICR C1 code flags an issue that needs making safe straight away. | The site may remain unsafe if the C1 electrical fault is not isolated, repaired and recorded quickly. | Make the area safe, arrange urgent EICR remedial work, and record what was done. | JDP can attend, make safe, complete commercial electrical remedial works and provide a clear record for your site file. |
| C2 potential danger listed | The EICR C2 code means the report has not passed cleanly. It may not need the same instant response as C1, but it still needs fixing. | The issue stays open, even if the building appears to be operating normally. | Get the C2 electrical fault remedial work planned and completed before treating the issue as closed. | JDP can prioritise commercial EICR remedial works, plan around site access and provide completion evidence. |
| FI further investigation required | The EICR FI code means more checking is needed before anyone knows whether remedial work is required. | The item sits unresolved, leaving you unclear on whether the installation is safe or whether further work is needed. | Arrange the investigation, confirm the findings, and turn any required work into a clear remedial plan. | JDP can investigate the issue, explain the findings and move it from an open item to a clear next step. |
| Work completed but paperwork unclear | A contractor may have attended, but the evidence is sitting in emails, missing detail or not linked back to the original EICR codes C1, C2, C3 or FI. | You may know the work was done, but struggle to prove it if asked. | Match completed works back to the original observations and store the paperwork together. | JDP can review what has been completed, identify gaps and organise the evidence into a clearer record. |
| Multiple remedials across different areas | The report includes several items across circuits, areas or systems. | Time is lost coordinating access, contractors, shutdowns, paperwork and cost decisions separately. | Prioritise the list, group works where possible and plan around safety, disruption and deadlines. | JDP can help turn an unsatisfactory EICR into a practical remedial plan, so urgent items, planned works and evidence are managed together. |
In practice, an unsatisfactory EICR is really a priority list. C1 issues need action straight away, C2 issues need EICR remedial works planned and completed, and FI items need investigating before anyone can say the issue is closed.
Most sites are not caught out because nobody cared.
They are caught out because work was done, but the record is unclear, missing or sitting in a different contractor’s inbox.
Discover the
EICR gaps businesses should identify before an auditor, landlord or compliance inspector asks to see the documentation.


C1 Meaning on EICR
Fast Response, Clear Sign-Off and Proof the Immediate Danger Has Been Made Safe


C2 Meaning on EICR
Prioritise the Repair, Plan Access and Close the Issue Before It Gets Challenged
A C2 code means there is potential danger.
It may not need the same immediate response as a C1, but it still needs to be taken seriously because the report has not passed cleanly.
This is where many commercial sites get caught out.
The report is filed away, the work is “being arranged”, but the issue remains open because nobody has clearly closed the loop.
Before arranging C2 remedials, check:
- Which areas of the building are affected?
- Will tenants, staff or visitors be disrupted?
- Is access, isolation or shutdown time needed?
- Will you get paperwork once the EICR remedial work is complete?
- Will the original EICR be supported by remedial certification?
What to think about: a C2 is not just a note in the report. Until it is fixed and signed off, the issue is still not properly closed.


FI Meaning on EICR
Get the Investigation Done, Confirm the Risk and Know the Next Step
FI means further investigation is needed before the engineer can confirm how serious the issue is.
This can feel less urgent because the report has not confirmed exactly what is wrong.
But until the investigation is complete, you still do not know whether remedial work is needed.
Facilities teams should find out:
- What needs checking?
- Is access, isolation or shutdown time needed?
- Will there be any disruption?
- When will the findings be confirmed?
- Could further EICR remedial works follow?
- What record will be provided once the investigation is complete?
What to think about: FI is not something to ignore because it sounds less urgent.
It is still an open item until someone checks it properly.
EICR Remedial Works Checklist
Signed-Off Works, Linked Paperwork and a Clear Trail From Fault to Fix
Before you file the report away or tell the team it’s sorted, check that:
- All C1 issues have been made safe, repaired and recorded
- All C2 issues have been completed and signed off
- All FI items have been checked, resolved or turned into clear remedial actions
- Completion paperwork is stored with the original EICR
- The person responsible for the site can find the paperwork quickly
- Any C3 recommendations are added to future maintenance plans
- There is a clear link between what was found and what was fixed
EICR remedial work cost can vary depending on access, urgency, parts, shutdown requirements and how many issues are listed in the report.
For commercial sites, the important thing is not just the cost itself, but whether the work is prioritised properly and recorded clearly once complete.
In practice, this is where many sites need support with electrical services.
The work may have been done, but if the paperwork is missing, split across contractors or hard to find, you can still be left answering questions during an audit, insurer review or internal check.
Discover how
regular electrical maintenance can help businesses across Nottingham and the East Midlands stay safe and audit-ready.
Commercial EICR Remedial Works Across the Midlands and Wider UK
Why Facilities Managers Use JDP for Clear Priorities, Reliable Attendance and Usable Completion Records
JDP supports commercial clients by helping them get EICR remedial works completed, recorded and easier to manage, so they are not left chasing different contractors or piecing paperwork together later.
Working with JDP gives facilities teams:
- Over 70+ years of combined experience, so the report can be reviewed properly and the right issues are prioritised first
- Fully insured and qualified engineers, so the remedial work is handled by a competent team
- Onsite and offsite support, so issues can be reviewed, planned and moved forward without unnecessary delay
- Calls answered, so you are not left chasing updates when timelines matter
- Fire, security and electrical support under one provider, helping reduce gaps between contractors, systems and records

Areas We Provide EICR Remedial Works
JDP delivers local contracts in the Midlands and South West, including:


Book a Free Commercial EICR Remedial Works Assessment
Know What Needs Fixing First, What It May Cost and What Proof You’ll Have at the End
Once you know what needs fixing first, what has already been dealt with and what paperwork you’ll have at the end, the pressure drops.
The biggest concern is arranging the work and still being left with loose ends - unclear actions, missing paperwork or nobody quite sure who is dealing with what.
A Free Assessment helps you understand the next step before you commit to the wrong one.
You’ll receive:
- A clear view of which EICR issues need urgent attention
- Confirmation of what needs fixing, checking or recording
- A practical plan for closing off commercial EICR remedial works
- A clearer view of what may affect EICR remedial works cost in the UK, especially where access, shutdowns or multiple remedials are involved
- A clear idea of what paperwork you’ll need for audits, insurers or internal records
- Next steps that show what needs doing first, and what can be planned in
Book your Free Assessment with JDP.
So when someone asks where things stand, you are not searching through old emails or relying on assumptions.
You know what has been fixed, what still needs attention and where the paperwork is.